Case study · Infrastructure audit

A 64-core terminal server froze at 30 users. It wasn’t too small.

A four-server audit for a client: domain controller, terminal server, database and finance.

Windows Server 2025ProxmoxRDS

The challenge

The client asked for one thing: “audit our server environment.” We reviewed four servers (domain controller, terminal server, database and finance) and documented findings across security, backup, permissions and performance.

One finding was critical. The terminal server had 64 vCPUs and 192 GB of RAM, yet it froze at around 30 users. Task Manager would not open. The team had concluded the server was too small and were about to spend money on a bigger one.

What we found

Windows Server 2025 had enabled VBS and Credential Guard inside a Proxmox VM, so every interrupt paid the hypervisor cost twice.

What we did

  1. 01

    Measured before touching anything

    Performance data collected from inside the VM and from the Proxmox host. CPU was only around 41%, but roughly 80% of it was kernel time, not user work.

  2. 02

    Ruled out the usual suspects

    Host CPU, memory and storage latency were checked and proved not to be the bottleneck. That pointed the investigation inside the guest.

  3. 03

    Found the real cause

    Windows Server 2025 had switched on virtualization-based security (VBS) and Credential Guard by default. Inside a VM that already runs on a hypervisor, Windows was running its own hypervisor on top: nested virtualization, so every interrupt and context switch paid the cost twice.

  4. 04

    Changed it in a planned window

    VBS was disabled during an agreed change window, with written rollback steps in case anything misbehaved.

  5. 05

    Validated at peak hours

    Measured again with the same users at the busiest time of day, and compared against the baseline.

What we learned

  • Before adding hardware, measure where the time is going.
  • New Windows Server releases change security defaults. Check them on virtualised servers after every upgrade.

More case studies

Other problems we have solved

Microsoft 365 migration Microsoft 365BitTitanExchange Online

100 mailboxes moved between Microsoft 365 tenants

A tenant-to-tenant move with mailboxes, data and the domain cut over to the new tenant.

How we did it: Planned and run with the BitTitan Mailbox Migration Bundle, from source-tenant preparation through to the final sync.

100 mailboxes · ~1 TB

Completed: 100 mailboxes and around 1 TB of data now running in the new tenant.

Project Online migration Project Server SESharePoint SEPowerShell

Project Online rebuilt on Project Server Subscription Edition

Microsoft retired Project Online on 30 September 2026, and there is no database migration path out of it.

How we did it: Custom fields, lookup tables, views, calendars and security were rebuilt from a read-only inventory; schedules were imported and published afterwards.

Live before the 30 Sep 2026 retirement

Live before the deadline, with the team working in it, and every value verified against the source system.

All case studies →